current PRODUCTION times
The production times listed below are expected but not guaranteed. Production times are estimated for the time it will take your order to ship from our factory after it has been placed, and they do not include transit time for delivery.
Orders for fabrics that are out of stock will carry longer production times.
All production times below are up-to-date as of November 6th, 2026.
Orders for fabrics that are out of stock will carry longer production times.
All production times below are up-to-date as of November 6th, 2026.
Roller Shade PRODUCTION TIMES
This fabric is out of stock until early November:
Production times are listed below:
Shades: 10 days
Sliding Panels: 28 days
- Luca Earth (LCA01)
- Luca Stone (LCA02)
Production times are listed below:
Shades: 10 days
Sliding Panels: 28 days
dual sheer shade PRODUCTION times
This fabric is out of stock until early December:
Production time is 8 days.
- Lainey Ivory (LNYO3)
- Lainey White (LNYO6)
Production time is 8 days.
STOCK DRAPERY PANEL PRODUCTION times
All fabrics are in stock.
Production time is 9 days.
Production time is 9 days.
NATURAL SHADES PRODUCTION times
All fabrics are in stock.
Production times are as listed below:
Shades: 14 days
Natural Drapery & Sliding Panels: 28 days
Production times are as listed below:
Shades: 14 days
Natural Drapery & Sliding Panels: 28 days
Fabric Roman Shades production time
This fabric is out of stock until mid-November:
Production time is 18 days
- Cardiff Cashew (CRD01)
- Speckled Latte (SPK03)
- Salina White (SLA03)
- Camellia Flour (CAL01)
- Clemente Pebble (CME05)
Production time is 18 days
natural roller shade production times
All fabrics are in stock.
Production times are as listed below:
Shades: 14 days
Sliding Panels: 28 days
Production times are as listed below:
Shades: 14 days
Sliding Panels: 28 days
OUTDOOR SHADE PRODUCTION TIMES
All fabrics are in stock.
Production time is 12 days
Production time is 12 days
Soft treatment PRODUCTION times
This fabric is out of stock until mid-November:
Production time is 14 days
- Wren Chalk (ISST-304)
Production time is 14 days